This project was commissioned by the City of Las Vegas to improve a major east-west urban arterial within the City of Las Vegas. The project included the extension of an existing storm sewer system to collect and divert storm water flows upstream of an existing school that had experienced drainage and flooding problems in previous years. The project also included new curb & gutter, sidewalks, drive pads, new asphalt paving and the design of a new entrance road and bus loop road for the school. The project included substantial coordination of the design with both the City and School District officials.